更新时间:2020-06-29 11:30:48
封面
版权信息
Brief Introduction of the Book
Preface
Foreword
PartⅠ Construction of Slab Type Ballastless Track in Turnout Area
1 Structure Overview of Slab Type Turnout Area
1.1 The Structure of Slab Type Turnout Area on Subgrade
1.2 The Structure of Slab Type Turnout Area on Bridge
2 Track Intersection in Turnout Area and Turnout Laying Setting out
2.1 Track Intersection in Turnout Area
2.2 CP Ⅲ Track Control Network Resurvey
2.3 The Survey Coordinates Conversion for Datum Mark and Angular Point
2.4 Surveying for Foundation Piles of Slab Type Ballastless Turnout
3 Construction of Slab Type Turnout Area on Subgrade
3.1 Slab Type Turnout Laying on Subgrade
3.2 Construction Technological Flow
3.3 Construction Technology and Technical Requirement for Concrete Cushion
3.4 Construction Technology and Technical Requirement for Turnout Slab Laying
3.5 Assembly Technology and Technical Requirement for Turnout Steel Rail Piece
3.6 Labor Organization on Construction Site
3.7 Main Construction Machine and Equipment Configuration
3.8 Quality Inspection and Acceptance
3.9 Quality Control
4 Slab Type Switch Area Construction on Bridge
4.1 Slab Type Turnout Laying on Bridge
4.2 Construction Technological Flow
4.3 Construction Technology and Method
4.4 Quality Inspection for Turnout Slab Fine Adjustment
4.5 Labor Force Organization on Construction Site
4.6 Configuration of Main Construction Machine Equipment
4.7 Quality Control
PartⅡ Construction of Ballastless Track in Sleeper Type Switch Area
1 Overview of Sleeper Type Switch Area Structure
1.1 The Structure of Sleeper Type Switch Area on Subgrade
1.2 The Structure of Sleeper Type Switch Area on Bridge
2 Transportation,Storage and Hoisting for Turnout Materials
2.1 Transportation,Storage and Hoisting For Turnout Components
2.2 Transportation and Hoisting for Switch Track Section Components
3 Switch Area Track Intersection and Turnout Laying Setting out
3.1 Switch Area Track Intersection
3.2 CP Ⅲ Track Control Network Repeating Survey
3.3 Turnout Laying Setting out and Densified Point Surveying
4 Construction of Sleeper Type Turnout Area on Subgrade
4.1 Laying of Sleeper Type Turnout on Subgrade
4.3 Construction Technology and Technical Requirement for Concrete Supporting Layer
4.4 Construction Technology and Technical Requirement for Turnout Track Bed Slab
4.5 Labor Organization on Construction Site
4.6 Disposition for Main Construction Machine & Equipment,and Inspection and Measuring Instrument
4.7 Quality Inspection and Acceptance
4.8 Quality Control
5 Construction of Sleeper Type Switch Area on Bridge
5.1 Laying of Sleeper Type Switch Areaon Bridge
5.2 Construction Technological Flow
5.3 Construction Technology and Technical Requirement for Concrete Bed Plate
5.4 Paving Technology and Technical Requirement for Isolated Layer
5.5 Construction Technology and Technical Requirement for Turnout Track Bed Slab
5.6 Labor Organization on Construction Site
5.7 Disposition for Main Construction Machine & Equipment,and Inspection and Measuring Instrument
5.8 Quality Control and Acceptance
5.9 Quality Control
6 Turnout Rail Welding
6.1 Overview
6.2 Construction Technological Flow
6.3 Construction Technology and Technical Requirement
6.4 Labor Organization on Construction Site
6.5 Disposition of Main Construction Machine & Equipment,and Inspection and Measuring Instrument
6.6 Quality Inspection and Acceptance
6.7 Quality Control
References