Construction Technology of Slab Type and Sleeper Type Ballast less Track in Turnout Area
上QQ阅读APP看书,第一时间看更新

3.6 Labor Organization on Construction Site

According to engineering amount and construction period requirement in turnout area,the slab type turnout laying site for single working plane is allocated with person in charge on site,technical supervisor,quality inspector and safety supervisor,the construction layer falls into two construction team and five work squads,for specific labor organization see Table 4.

Table 4 Labor Organization for Turnout Area Construction

Based on actual site condition,the technician numbers for different post can be appropriately adjusted,to try to satisfy construction requirement.